Switch Your EU Authorized Representative Without a Gap in Market Access

Key facts: changing your EU authorized representative

  • The change is governed by Article 12 of Regulation (EU) 2017/745 (MDR) and Regulation (EU) 2017/746 (IVDR).
  • You need a new written mandate under Article 11(3) and a change agreement between you, the incoming authorized representative and, where practicable, the outgoing one.
  • The agreement must cover the mandate dates, the label transition period, the transfer of documents and the forwarding of complaints and incident reports.
  • For the same generic device group, only one authorized representative may hold the mandate at any time (Article 11(1); MDCG 2022-16).
  • Your SRN stays the same. Only the EU REP linked to your actor registration in EUDAMED is updated.

A change of EU authorized representative is the transfer of the mandate under Article 11 MDR/IVDR from one authorized representative to another. Article 12 of both regulations sets out how the change has to be arranged. The EU authorized representative is also referred to as EU REP, EU-REP, EC REP or simply "AR", and EU legal texts spell it "authorised representative".

Manufacturers rarely switch on a whim. Usually, response times have slipped, fees have become hard to predict, or the support no longer matches what a role this critical to compliance requires. If you plan the switch properly, your devices stay covered throughout.

With 30+ years of experience, MedNet EC-REP GmbH, established in Münster, Germany, acts as an independent authorized representative for more than 700 manufacturers, covering the EU, UK and Switzerland. We don't do consulting, so there's no conflict of interest between representing you and advising you.

Not yet appointed an EU REP? See our EU Authorized Representative service. This page covers the EU. Changing a UK Responsible Person or a Swiss CH-REP follows different rules: UK RP service or CH-REP service.

Why Do Manufacturers Switch Their EU REP?

Common reasons include:

  • Slow responses to authority requests or vigilance cases
  • Support that stops at the bare minimum of the mandate
  • Unclear or rising fees
  • New product categories the current EU REP doesn't cover
  • Wanting one partner for the EU, UK and Switzerland instead of three separate relationships

What Does Article 12 MDR/IVDR Require When You Change Your EU REP?

Article 12 requires a written agreement between the manufacturer, the incoming authorized representative and, where practicable, the outgoing one. It must cover at least four points. In addition, the new EU REP needs its own written mandate that it has accepted and that covers at least the tasks listed in Article 11(3).

Article 12

What to agree

The question it answers

(a)

End date of the old mandate, start date of the new one

Who is responsible on which day?

(b)

Until when the old EU REP may appear in the information supplied by the manufacturer, including labels, IFUs and promotional material

How long can existing stock and material stay in use?

(c)

Transfer of documents, including confidentiality and property rights

Who gets which documents, and when?

(d)

The outgoing EU REP's duty, after its mandate ends, to forward complaints and reports of suspected incidents to the manufacturer or the new EU REP

What happens to reports sent to the old address?

The full text of both regulations is available on EUR-Lex: MDR (EU) 2017/745 · IVDR (EU) 2017/746. The Medical Device Coordination Group's guidance MDCG 2022-16 on authorized representatives also addresses the change of authorized representative (Section 9).

Who Does What During the Switch?

Task

Manufacturer

New EU REP

Outgoing EU REP

Terminate the old mandate

Yes

Not involved

Receives notice

Sign the new Article 11(3) mandate

Yes

Yes

Not involved

Article 12 change agreement

Yes

Yes

Where practicable

Record the new mandate in EUDAMED

Records it

Confirms it

Not involved

Mark the old mandate as terminated in EUDAMED

Can do it

Not involved

Can do it

Update labels, IFU and Declaration of Conformity

Yes

Not involved

Not involved

Forward complaints and incident reports after the mandate ends

Receives them

Receives them

Yes

What Do Manufacturers Need to Update After Switching?

The new EU REP handles the representative's part. On your side, the following need to be updated:

  • Labels and IFUs need the name and address of the new authorized representative (Annex I, Section 23.2(d) MDR and Section 20.2(d) IVDR), shown with the EU REP symbol. This has to be done within the transition period agreed under Article 12(b).
  • Your EU Declaration of Conformity names the authorized representative (Annex IV, point 1 MDR) and states its SRN. Every affected DoC needs to be reissued.
  • If your devices are certified, tell your Notified Body about the change. Certificates under the MDR name the authorized representative (Annex XII, Chapter II, point 2), so your Notified Body decides how the certificate is updated.
  • In EUDAMED, the new mandate is recorded on your actor registration. Your SRN stays the same.
  • Internal records such as contracts, QMS documentation and supplier or partner lists also need updating.

Can You Combine the Switch With the EC REP to EU REP Symbol Update?

Yes, and it saves you a print cycle. The amendment EN ISO 15223-1:2021/A1:2025 replaces the "EC REP" symbol with "EU REP". It was harmonized under the MDR and IVDR in June 2026 (Commission Implementing Decisions (EU) 2026/1231 and 2026/1313), and the previous version of the standard can still be used until 17 June 2031. If you're reprinting labels and IFUs anyway, you can include the new authorized representative in the same print cycle and pay for artwork, translations and approvals only once. Read more about the EC REP to EU REP symbol change.

How Do You Switch Your EU Authorized Representative? Step by Step With MedNet EC-REP

  1. Initial call: We go through your setup with you: the notice period of your current mandate, your product portfolio and your SRN.
  2. Transition plan: We agree the key dates with you: when the old mandate ends and the new one begins, the label transition period and the document handover.
  3. New mandate: You and MedNet EC-REP sign a written mandate under Article 11(3) MDR/IVDR.
  4. Article 12 agreement: The change agreement is signed by you, us and, where practicable, your outgoing EU REP.
  5. EUDAMED: You record the new mandate in your actor registration and we confirm it. You or your outgoing EU REP mark the old mandate as terminated.
  6. Document handover: Technical documentation, Declarations of Conformity, certificates and any open authority correspondence (pending vigilance cases, inquiries) are transferred to us.
  7. Labeling and DoC: You update your labels, IFUs and Declarations of Conformity within the agreed transition period.
  8. Confirmation: We confirm in writing that the transition is complete, and you receive confirmation from your outgoing EU REP that no obligations remain open.

How Do You Avoid a Gap in EU REP Coverage?

Line up the end of the old mandate exactly with the start of the new one, and agree both dates in writing. If the old mandate ends before the new one is in place, your devices have no valid authorized representative for that period, and devices from a manufacturer outside the EU can't lawfully be placed on the EU market without one. The notice period in your current mandate decides how much time you have:

Your situation

Recommended action

Notice period of 3 months or more

Standard timeline: start preparing the new mandate now

Notice period of 1 to 3 months

Prepare the document handover in parallel with the termination notice

Notice period under 1 month, or unclear

Talk to your new EU REP straight away to check whether there is a risk of a gap

Notice already given, handover date not confirmed

Get the handover date confirmed in writing by both EU REPs first

Frequently Asked Questions About Changing Your EU REP

Thinking About Switching Your EU REP?

MedNet EC-REP goes through your current setup and timeline with you. There's no obligation, and you get a transition plan that keeps your devices covered at every step.

Reviewed by the MedNet EC-REP Regulatory Affairs team · Last updated: 23.11.2026